Loading Events
  • This event has passed.

NOTICE: Due to the variable nature of construction projects, the painting schedule may be altered based on how much work is accomplished. Please check back daily for updates.

1st Floor: Prep work/Lead Abatement may begin on Friday.

2nd Floor: Prep work/Lead Abatement. Special requirements for Lead Abatement include:

  1. Hanging plastic sheeting along the walkway railing from floor to ceiling which will enclose the entire area hallway, but with open entrances at the stairwell. This protects the painting area from wind and dust as well as protects other nearby areas from old paint lead dust and paint over spray. The protective plastic wall will be in place for the duration of the painting for that area.
  2. NO CONDO ACCESS for 2nd floor condos during the toxic lead abatement procedures at the following times:
  3. MONDAY, April 3 from 1:00 pm – 3:30 pm and Tuesday-Friday, April 4-7, 8:00 am to 3:30 pm.                                                      Condo occupants can leave or stay inside the condo for the entire time, but will not be allowed to enter or exit.                                                       (You will see the workers in protective Hazmat Suits. Sorry, we don’t have any extra for Maui Sands residents)

Where you can rest while waiting for access to your condo:

The Tiki Lounge near the swimming pool will be open to anyone who needs to a place to talk story. There are public restrooms for use at the pool. Hanging out at the swimming pool and using the BBQ’s for lunch.

www.mauisandscondos.com suggests that it’s a great time to hit the Road to Hana, pack up and go to our favorite Kaanapali Beach, or go shopping at Whaler’s Village!

 

Share This Story, Choose Your Platform!