Building 2 Week 1: Upstairs Plastic Barrier Wall Up all week, Lead Abatement, Painting Entrance side of condos.

  1. 4/24 Monday

8:00 am – 12:30 pm Staging of Building 2 Upstairs: Workers install plastic barrier wall enclosing and protecting walkway side of the building.

12:30 pm -3:30 pm Lead Abatement. Condos will NOT be accessible during this work due to lead dust. Plan on being out of the area during this time.

  1. 4/25 Tuesday

8:00 am – 3:30 pm Lead Abatement. Condos will NOT be accessible during this work due to lead dust. Plan on being out of the area during this time.

  1. 4/26 Wednesday

8:00 am – 3:30 pm Lead Abatement. Condos will NOT be accessible during this work due to lead dust. Plan on being out of the area during this time.

  1. 4/27 Thursday

8:00 am – 3:30 pm Plastic Barrier on 2nd floor taken down. Painting of trim and sides of buildings. Condos will be accessible with some interruption from painting.

  1. 4/28 Friday

8:00 am – 3:30 pm Painting of trim and sides of buildings. Condos will be accessible with some interruption from painting.

  1. 4/29 Saturday – No Work
  2. 4/30 Sunday – No Work